Mise à jour : 2025-06-11 Aperçu:571 Pour :O6 v1.0、
Model Number: O6V1.0 Question Classification: Function Settings
Part 1:Prepare for configuration
Part 2:Detailed operation
Pat 3: Remote debugging and installation of equipment
1. The two O6 (B A/ device), two cables, two power supply.
2. Use the power supply, network cable, respectively, to equipment A, equipment B electrify:
